Construction methods are constantly upgraded to ensure that longevity and strength of buildings. Solutions for concrete installations are often made to further strengthen slabs and other structures. This is also to provide them with more stress bearing potential.

tensioned-cable-systemsAll quality items related to creating housing, working spaces, transport systems, plants and vital facilities for industry, defense or civil engineering, pre-stressing and tensioning cement solutions are studied. Post tension cables are the most widely used materials for creating high stress load ranges for structures that are meant to last and provide great strength. It takes experts to handle these cables and assure quality as well as post construction concerns.

These things need to be done right. The spaces are measured precisely and built according to plans and specifications. But for strengthening purposes engineers and workers have good margins to where they can safely work. This is to ascertain the process of post tensioning and pre-stressing cement.

The standard uses for cables that are laid down before cement is laid on for purposes of design and engineering are high rise structures, residential slabs, bridges, foundations, and dams. They are also unique to industrial pavements, tanks, silos, nuclear containment and defense facilities. Steel cables have an acknowledged tensile strength that is so useful in reinforcing cement installations in different ways.

Post tensioning is a technique for making strong slabs with reduced thicknesses and longer spans between posts and support structures. It is quite useful for improving total performance and in saving materials and time. The method is an innovation on pre-stressing, a system that includes preparatory stressing and a later phase in which the wires are stressed when the liquid concrete begins to strengthen.

The steel wires are first into plastic sheathing units. Then they are laid down in a pattern and are attached to a framework that holds them in place. They are tensioned then or pre-stressed. After the cement is poured on, some time is taken to let it strengthen or harden and then the wires are pulled or stressed to make them tighten and are then anchored to adjacent structures.

The laying down of tensioned cable systems should be well planned. This is to ensure that repair work or remodeling can be done later, when other elements are added to a structure. It is also done to lessen the danger involved when digging up cables for work below ground levels which is usually a problem for companies that work with laying the groundwork or using underground systems.

In this way, the integrity and strength of structures are ensured. The technologies available has constantly improved through the years. For cables themselves, this means better steel-making and the use of gadgets like GPR or ground penetrating radar for checking out systems after installation.

If and when newer methods are introduced in the industry, there are always items for improved stressing and cable use. These are now the most relied upon ways to take any work above projected standards. The field is being upgraded all the time by adding on new knowledge from after every project is completed.